The project

Building with a mix of Structural Steel and woodwork consisting of 5 levels. 

The challenge

TBD

The solution

Cyntech was engaged to provide a value-engineered helical pile alternative. The use of helical piles allowed for a smaller construction footprint to allow access to foundation locations, minimized excavations, and provided a deep foundation that accommodated the loads. Overall, the client was able to realize a savings in both cost and time.

  • 150 helical piles
  • Concrete embedded pile cap design
  • Value-engineered helical pile alternative to spread footings
Techniques

Project facts

Owner(s)

EV606

Keller business unit(s)

Cyntech Group

Main contractor(s)

Q Construction